No under 16s

Hands-On Workshop - Understanding Emergency Power Installation Configurations

Tue May 28, 08:30 - Tue May 28, 15:00

Charles Morkel Hall, Strand

ABOUT

WORKSHOP OVERVIEW:



Understanding Emergency Power Installation Configurations


  • Sub Distribution Board Wiring: Learn the essentials of wiring for inverters and generators.
  • Circuit Protection Selection & Installation: Discover the right choices for wires, circuit breakers, earth leakage units, and surge protection.
  • Essential vs. Non-Essential Circuits: Understand how to split circuits, including the proper handling of neutral bars.
  • Change-Over Switch Connection:
  • Master the process of connecting change-over switches where standby power feeds into a section of the main distribution board. Sub-Distribution Board Integration: where standby power feeds in after the main distribution board (point of supply) into a sub-distribution board.
  • Earth-Neutral Bonding: Learn the critical aspects of bonding via a contactor.


  • PLEASE NOTE THIS IS A PRACTICAL TRAINING WORKSHOP WITH THEORY - PPE IS ESSENTIAL
  • TOOLS WILL BE PROVIDED
  • DURATION 6 HOURS
  • REFRESHMENTS WILL BE SERVED


THIS IS NOT A QUALIFICATION AND YOU WILL ONLY RECEIVE AN IN - HOUSE CERTIFICATE OF ATTENDANCE STIPULATING WHAT YOU HAVE LEARNT.



SUB DISTRIBUTION BOARD FOR STANDBY POWER START 2 FINISH


Wiring SUB DISTRIBUTION BOARDS:

Understanding the SANS 10142 standard and its key diagrams ANNEX P (Fig. 1-4)

  • Connecting earth leakage units to essential circuits for safety

Managing Essential Circuits:

Techniques for separating essential circuits with separate neutral bars

  • Splitting neutral circuits on the main distribution board
  • Installing Changeover Switches
  • Selection and installation of 2-pole input and output breakers to and from the standby power source
  • Choosing the correct 2-pole circuit breakers for inverter inputs and outputs
  • Selecting the correct Wiring Sizes
  • Determining proper wiring sizes for various inverter models (Deye, Lux, Sunsynk) based on manufacturer tables

Protecting Inverter Systems:

Installing surge protectors to safeguard the inverter

Understanding earth-neutral bonding with contactors

Additional Components:

  • Installing pilot lights for standby power indication
  • Proper labeling for sub-distribution boards

Quality Assurance and Safety:

  • Conducting continuity testing to ensure correct installation before activating the system

Implementing best practices to minimize risks and ensure reliable operation

This comprehensive workshop equips you with practical skills to work with AC combiner boxes and related components, ensuring safe and efficient installations in residential electrical systems.

DIRECTIONS

Hands-On Workshop - Understanding Emergency Power Installation Configurations
Charles Morkel Hall, Strand
Church St & Broadway Blvd, Strand, Cape Town, 7140
Get Directions